InOpera Group was a proud supplier of the marble selection for the Buckingham Green project near St James’s Park. Today we are revealing the production and installation process behind the book-matched Borghini marble, installed at the reception of the Tower building.
The Tower building was completely restored by Fletcher Priest Architects, alongside constructing two new buildings on each side.
The core of the fully-glazed, double-height residential reception at The Tower reads as a coherent object, lined in full-height, book-matched Calacatta marble. This carefully selected Italian marble is emblematic of the scheme’s quality and the attention to detail.
– Fletcher Priest Architects.
Technique of book-matching
A similar technique as used for constructing the marble sink-tops using Neo Marquina marble. The edges of each piece were matched and polished. Later, the sink is perfectly slotted into the gap.